Laserfiche WebLink
BEING A PORTION OF THE EAST HALF (E Yz) FOR THE SOUTHEAST QUARTER (SE Y4) OF SECTION 14, <br />TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE SIXTH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, <br />STATE OF COLORADO <br />NOLTE PIT #1 <br />RECLAMATION MAP <br />-.- SD <br />5100 <br />- - 5101- <br />-6100- <br />5101 <br />I IIM u <br />�• <br />• • +• `j <br />H v 1a <br />PS <br />LEGEND <br />PROJECT BOUNDARY <br />AFFECTED MINE AREA BOUNDARY <br />EXISTING MAJOR CONTOUR <br />EXISTING MINOR CONTOUR <br />PROPOSED MAJOR CONTOUR <br />PROPOSED MINOR CONTOUR <br />EXISTING FENCE <br />EXISTING CULVERT <br />TOPSOIL STOCKPILE <br />PERMANENT SEEDING (SEE <br />RECLAMATION PLAN FOR SEED MIX) <br />HAUL ROAD <br />- CONTRACTOR TO USE TOPSOIL STOCKPILE IDENTIFIED ON <br />THE MINING PLAN AND REPLACE 4- TO 8" OF TOPSOIL <br />ON ALL AREAS THAT WERE DISTURBED DURING GRADING <br />ACTIVITIES. <br />RECEIVED <br />MAY 0 3 2012 <br />GRAND JUNCTION FIELD OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFETY <br />• <br />• <br />MIN <br />100 0 6 <br />NORTH •CALE: 1'- 100 <br />0 <br />LE <br />CLC ASSOCIATES <br />•YHt 00000 eO <br />tteHwaoa g <br />O e 11 <br />I i0 170 0040 <br />e <br />r:4714uiu <br />LANDSCAPE Hntaruee <br />Ne u «e iu <br />PROJECT #: 10.0040 <br />DRAWN •Y: OS0 <br />DCSIONED SY: 0.0 <br />CHECKED SY: DJM <br />