My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - M1999120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2012-05-04_REVISION - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:59 PM
Creation date
5/7/2012 3:28:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
5/4/2012
Doc Name
COPIES: Proof of Publication, Adjoining Owner Return Receipt cards, 12 executed Structure Agreements
From
ENVIROMENT, INC.
To
DRMS
Type & Sequence
AM2
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.G. EVERIST, INC. <br />RECEIVED <br />MAR 0 5 2012 <br />Duke Energy & DCP Midstream LLC a Eve list INC <br />307 17th St, #900 <br />Deriver, CO 80202 <br />February 17, 2012 <br />RE: Damage Reimbursement Agreement <br />L.G. Everist, Inc. - Fort Lupton Sand and Gravel Mf Permit # M-1999-120 <br />To whom it may concern: <br />L.G. Everist, Inc., is making an amendment to their Colorado Mined Land Reclamation (MLR) permit to <br />extract construction materials from a tract of land located in Parts of Section 19, 30 & 31, T-2-N, R-66-W <br />and parts of Sections 25, & 36, T-2-N, R-67-W, 6th Prime Meridian, Weld County, Colorado. <br />State MLR law requires the permit applicant to agree to reimburse the owner of any permanent man-made <br />structure(s) within 200 feet of the mining area for damage done to the structure(s) as a result of the <br />permitted operation. We believe Duke Energy & DCP Midstream LLC own the structure(s) listed below. <br />L.G. Everist, Inc. agrees to reimburse Duke Energy & DCP Midstream LLC for any damage done to the <br />structure(s) listed below as a result of the proposed mining operation. Your acknowledging signature and <br />a notary seal in the spaces provided below should satisfy the MLR law reimbursement requirement. <br />Please return this agreement within 30 days of receiving it if at all possible. Enclosed is a stamped <br />addressed envelope so you can returned the executed agreement to us. We have also enclosed a <br />second copy of this letter that you may keep for your files. Thank you for your cooperation. <br />Sincerely, <br />Lynn Mayer Shults <br />Regulatory Manager <br />cc: Division of Reclamation, Mining & Safety <br />file <br />Structure list: <br />8-natural gaslines <br />STATE OF <br />) ss . <br />= <br />COUNTY OF `, <br />The forgoing was acknowledged, subscribed <br />and sworn to before me, a Notary Public, <br />this " day of 11 t! — <br />, <br />By 1. t <br />N99:1 <br />My commissi <br />CORPORATE OFFICE <br />300 S. PHIWPS AVE. • SUITE 200 <br />P.O. BOX 5829 <br />SIOUX FALLS, SO 57117-5829 <br />PHONE 805-334-5000 <br />FAX 805-334-3856 <br />MOUNTAIN DIVISION <br />7321 E. 88TH AVENUE • SUITE 200 <br />HENDERSON. COLORADO 80840 <br />303-287-9808 <br />FAX 303-289-1348 <br />ACKNOWLEDGED BY: <br />Duke Energy & DCP Midstream LLC <br />Title <br />expires : <br />
The URL can be used to link to this page
Your browser does not support the video tag.