Laserfiche WebLink
Table 19. Surface Facilities List (cont.) <br />Slope structure <br />Topsoil stockpile areas <br />Transfer building <br />Transfer conveyor belt <br />Walkway tunnel <br />Post -law facilities constructed or permitted after August 3, 1977. <br />Acid tank <br />Portable Truck Scales <br />Antifreeze tank sump <br />Bates Portal Conveyor Drive <br />Clean Coal Plant conveyor <br />Bates Portal Conveyor belts 1, 2 &3 <br />Conveyor belt drive (East Portal) <br />Bates Portal transfer tower <br />Refuse Belt Extension - Northeast <br />Emergency escape hoist <br />C &W Train Shop <br />Fuel tank containment sumps (2) <br />10 Stall Garage <br />Hoist house, sheave <br />C &W Trains Sand Loading Building <br />Mine dewatering pumps (2) <br />Car Department Office <br />Raw coal conveyor belt <br />Fire Hose Building <br />Raw coal reclaim tunnel <br />Small propane tank <br />Refuse conveyor belt <br />Refuse Conveyor Extension (200' Rigid) <br />Refuse disposal area <br />Two 150 Long Radial Stackers for RDA <br />Silo loadout conveyor belt <br />Refuse Conveyor - 500' Long Portable <br />Stacking tubes (2) <br />DWDA Belt Feeder <br />Subsoil storage stockpile <br />DWDA Transfer belt 500' Long Portable <br />Thickener pump house <br />DWDA Elevating Belt 100' Long <br />Thickener Tank <br />Truck Loading System Near Silos <br />Wash plant <br />Phase 1 released <br />Warehouse #2 <br />Removed from site <br />Development coal waste pile <br />Electrical house <br />Loadout belt building <br />Rail car and refuse belt de -icer <br />Raw coal stockpile Areas #3 and 4 <br />Refuse disposal slurry lines (permitted but not constructed) <br />Sparge/VES remediation system <br />Transfer to loadout belt <br />Truck dump <br />Truck dump conveyor <br />Warehouse #3 Pad <br />Permanent <br />Garage (Ambulance bay) <br />Coal lab (NECC offices) <br />River crossing culvert at main property entrance <br />River crossing foot bridge #2 <br />Map 12. Surface Facilities and Roads - West Portal <br />Facilities constructed prior August 3, 1977. <br />Fan shaft <br />Post -law facilities constructed or permitted after August 3, 1977. <br />Bio- remediation storage site Light use road to slurry wells S2 and S3 <br />Non -coal disposal area <br />Topsoil borrow area Powerlines from East Portal <br />West portal fan Power Substation <br />Removed from site <br />Cap house <br />Core house <br />Garage /oil house <br />Hoist house <br />Powder house <br />Pump house <br />Warehouse 41 w /walkway tunnel <br />MR -113 Page 2.05 -6a Revised 04/05/12 <br />