Laserfiche WebLink
SUMMARY OF DISTURBANCE <br />Mine Area <br />Reclaimed less than 10 years <br />0.0 ac <br />Reclaimed greater than 10 years <br />349.6 ac <br />Areas to be Reclaimed <br />0.0 ac <br />Areas Approved as Permanent <br />40.1 ac <br />Areas Pending Permanent <br />0.0 ac <br />MINE TOTAL <br />389.7 acres <br />Loadout Area <br />Reclaimed 10 years or less <br />0.0 ac <br />Reclaimed greater than 10 years <br />6.9 ac <br />Pond reclaimed (2011) <br />0.2 ac <br />Areas Approved as Permanent <br />4.6 ac <br />LOADOUT TOTAL <br />11.7 acres <br />Marr Mine and Loadout <br />2011 Reclamation Report <br />12.0 TOTAL DISTURBANCE SUMMARY <br />The following table summarizes the total disturbance at the Marr Mine and Loadout including <br />the reclaimed areas, areas to be reclaimed and the permanent facilities. <br />The attached DRMS form categorizes the reclamation acreage, as per OSM request, and <br />summarizes the total mining - related disturbance and reclamation at the Kerr /Marr Mine and <br />Loadout since the initiation of mining. <br />DRMS Report Form: Acreage reported in previous DRMS Forms pertaining to acreage <br />released for Phase 1 at the Loadout site has been in error. Bond Release No.2 (SL -02) <br />included the Loadout site for Phase 1 Bond Release. However, to update the acreage number <br />shown on the DRMS Form was apparently overlooked and did not include the Loadout in the <br />total acres shown as Phase 1 Released. The 2010 and 2011 DRMS Forms have been updated <br />to include the Loadout (11.7 acres) which changes the total acres for `Phase 1' Bond Release to <br />401.4 acres. <br />Bond Release No.4 (SL -04) included 6.9 acres at the Loadout approved for `Phase 2' Release. <br />The entrance road and shop building (approved as permanent) apparently were not included in <br />the Phase 2 Release. Acreage not yet approved for Phase 3 Bond Release includes the <br />Loadout (11.7 acres) and at the mine site (17 acres) which calculates to 28.7 acres. Total <br />acreage to date, that has been released for the Phase 3 Bond Release is 372.7 acres. <br />If you have any questions or require further information or clarification, please contact the <br />undersigned. <br />Sincerely, <br />orge V atterson <br />General Mine Mgr <br />6 <br />Apr 27, 2011 <br />