Laserfiche WebLink
Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar <br />Year <br />Cumulative Total <br />Acres disturbed <br />28.7** <br />+ <br />0.0 <br />= <br />28.7 <br />Acres backfilled and graded <br />365.0 <br />+ <br />0.2 <br />= <br />365.2 <br />Acres topsoiled (including <br />reseeded) * ** <br />356.5 <br />+ <br />0.2 <br />= <br />356.7 <br />Colorado Division of Reclamation Mining & Safety <br />Annual Reclamation Report for the Year 2011 <br />MARR MINE C -80 -006 <br />mine name permit # <br />Address: 10390 BRADFORD ROAD STE 205 LITTLETON, CO 80127 -6416 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. ( ** does not include acres Phase 3 Released) <br />( * * *8.5 acres are included in the Permanent Facilities category). <br />Note: Loadout pond was backfilled but not reseeded in 2011 (reseeded in 2012). <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine the total number of acres disturbed 401.4 and the total number of acres: <br />Phase I released 401.4 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 0_0 <br />For Government Performance and Results Act <br />Acreage in active mining areas 3 _ <br />(exclude acres where Phase III release has been achieved) <br />KERR COAL COMPANY <br />Permittee <br />Phase II released 394.5 Phase III released 372.7 <br />Acreage in long -term mining or reclamation facilities 2 4.6 Loadout & road & shop + 0.2 acres Loadout <br />Pond. Permanent structures, roads, ditches, shop pad & permanent ponds at mine site (40.1 acres). <br />Total = 44.9 acres. <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; non - backfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and non -coal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative <br />Total <br />This <br />Calendar <br />year <br />Cumulative <br />Total' <br />10 years or <br />less <br />Greater <br />than 10 <br />years' <br />Acres seeded* <br />14.9 <br />+ <br />0.0 <br />= <br />14.9 <br />= <br />0.0 <br />+ <br />14.9 <br />Colorado Division of Reclamation Mining & Safety <br />Annual Reclamation Report for the Year 2011 <br />MARR MINE C -80 -006 <br />mine name permit # <br />Address: 10390 BRADFORD ROAD STE 205 LITTLETON, CO 80127 -6416 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. ( ** does not include acres Phase 3 Released) <br />( * * *8.5 acres are included in the Permanent Facilities category). <br />Note: Loadout pond was backfilled but not reseeded in 2011 (reseeded in 2012). <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine the total number of acres disturbed 401.4 and the total number of acres: <br />Phase I released 401.4 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 0_0 <br />For Government Performance and Results Act <br />Acreage in active mining areas 3 _ <br />(exclude acres where Phase III release has been achieved) <br />KERR COAL COMPANY <br />Permittee <br />Phase II released 394.5 Phase III released 372.7 <br />Acreage in long -term mining or reclamation facilities 2 4.6 Loadout & road & shop + 0.2 acres Loadout <br />Pond. Permanent structures, roads, ditches, shop pad & permanent ponds at mine site (40.1 acres). <br />Total = 44.9 acres. <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; non - backfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and non -coal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />