My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - C1980006
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2012-05-04_REVISION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:20 PM
Creation date
5/7/2012 2:09:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
5/4/2012
Doc Name
Response to DRMS Adequacy Review
From
Energy Fuels Coal Inc
To
DRMS
Type & Sequence
TR25
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX. (303) 832 -8106 <br />November 30, 2011 <br />Mr. George Patterson, General Mine Manager <br />Energy Fuels Coal, Inc. <br />P.O. Box 459 <br />Florence, CO 81226 <br />RE: Marr Mine (DRMS Permit C- 1980 - 006), TR -25 adequacy review <br />Dear Mr. Patterson: <br />The Division has reviewed the TR -25 application from Kerr Coal Company (KCC). TR -25 proposes to revise the <br />currently approved reclamation success vegetation species diversity standard. The intent of the proposed revision is to <br />more closely reflect the species diversity measured in the reference areas. <br />Among the revisions that KCC proposes regarding the diversity standard for both the Mine area and the Loadout (aka <br />Tipple area) is the following: <br />The calculation of the species diversity values can he made using either data collected from either the,first or second year <br />of Phase III vegetation sampling period individually, or by averaging the data from the two monitoring periods into an <br />average percentage relative plant cm , er vale . <br />The Division is unable to accept this revision for reclamation success comparison. Rule 4.1 5.7(5) specifically states, The <br />revegetation success criteria, as defined in relevant subsections of 4.15, shall be met for at least two of the last four years <br />of the liability period." Successful species diversity is one of the relevant subsections (Rule 4.15.8(5)) requiring the <br />success criteria to be met for two years. KCC needs to revise this portion of the proposed success criteria to agree with <br />Rule 4.15.7(5). <br />Please address this adequacy item. <br />Sincerely, <br />Robert Zuber, P.E. <br />Environmental Protection Specialist <br />Office of <br />AA inert I Ind P Iamlfi.,n <br />STATE OF COLORADO <br />Cc: NWCC, 2580 Copper Ridge Drive, Steamboat Springs, CO 80487, attn: Nicholle Douglas <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pirieda <br />Director <br />Office of <br />Denver • errand lone tinn • Durance Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.