Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />May 3, 2012 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7` STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Zach Trujillo <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: <br />New Elk Mine Permit C- 1981 -012 <br />Technical Revision Application No. 64 <br />Shaft Installation Completeness Response #1 <br />Dear Mr. Trujillo: <br />RECEIVED <br />MAY 07 2012 <br />Division of Reclamation <br />Mining and $sfsty <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' letter dated April 16, 2012 transmitted its incomplete letter for the referenced <br />technical revision. On behalf of New Elk Coal Company (NECC) following are its responses to <br />the DRMS' comments and concerns. <br />1. DRMS - Please provide a description of the proposed return of coal mine waste to <br />abandoned workings required by the following Rules: 2.05.3 (9)(a -e) and 4.11.3. <br />NECC - See amended page 2.05 -44b for the required discussion. <br />2. Please provide a letter from the legal or equitable landowner that would initiate, <br />implement, approve, or authorize the use of the land following reclamation as required by <br />Rule 2.05.5(2)(b). <br />NECC - See attached letter from the landowner who is NECC. The County considers the <br />site to be grandfathered so it does not exercise any authority over the land use <br />classifications. The County is going to require NECC to obtain a special use permit for <br />the PR -04 permit expansion. <br />3. Please provide an updated Map 15 including the area of the proposed construction of the <br />29 -foot diameter ventilation shaft required by the following Rule: 2.05.5(2)(c). <br />NECC - An updated Map 15 is enclosed. <br />4. Please provide the design and calculations for the upland diversion ditches above the <br />proposed construction of the 29 -foot diameter ventilation shaft to fulfill the requirements <br />needed by the following Rules: 4.05.3(2 -3) and 4.05.3(7)(a -c) <br />