My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-05-04_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:20 PM
Creation date
5/7/2012 2:08:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
5/4/2012
Doc Name
Preliminary Adequacy Review
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
MR114
Email Name
JHB
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 203 <br />Date: 5/4/2012 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II LGP <br />Horsepower: 238 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost /Hour: <br />Ripper op. Cost /Hour: <br />Operator Cost/Hour: <br />Total unit Cost /Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Source of estimated \ olume: Division Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />2.200 <br />1.125 <br />2,475 LCY <br />Replace Topsoil from Stockpile to Six Drill Pads and Mud Pits <br />Materials consistency description: Consolidated stockpile 1.0 <br />5% <br />7.600 feet <br />2,550 lbs/LCY <br />$46.30 <br />$80.25 <br />$0.00 <br />$38.49 <br />125 feet <br />428.6 LCY /hr <br />Earth - Dry packed <br />BULLDOZER WORK <br />Permit Action: Minor Revision 114 Permit /Job #: C 1981012 <br />State: Colorado <br />County: Las Animas <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Abbreviation: None <br />Filename: C012 -203 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.