Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />201 <br />202 <br />203 <br />204 <br />Plug and Seal Six Exploration Holes <br />BOREHOLE <br />,. 1■1 ,..I <br />•■■, <br />36.00 <br />$10,629.86 <br />$4,683.08 <br />$2,349.72 <br />$2.837.83 <br />Regrade Six Drill Pads and Mud Pits <br />DOZER <br />28.38 <br />Replace Topsoil from Stockpile t Six Drill Pads <br />and Mud Pits <br />DOZER <br />14.24 <br />Reseed Drill Pads and Mud Pits with Rangeland <br />Seed Mix <br />REVEGE <br />2.76 <br />SUBTOTALS: <br />81.38 <br />$ $20,500.49 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 200 <br />Date: 5/4/2012 <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 40.69 <br />Profit: 10.00 <br />Minor Revision 114 Cost Summary <br />State: Colorado <br />County: Las Animas <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering xvork and /or contract /bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY WORK <br />Permit Action: Minor Revision 114 Permit /Job #: C1981012 <br />0.00 <br />4.61 <br />3.58 <br />Abbreviation: None <br />Filename: C012 -200 <br />Total = $414.11 <br />Total = $215.26 <br />Total = $2,412.92 <br />Total = $2,050.05 <br />TOTAL 0 & P = $5.092.34 <br />CONTRACT AMOUNT (direct + O & P) = $25,592.83 <br />Total = 0.00 <br />Total = $1.179.83 <br />$916.22 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7.188.39 <br />TOTAL BOND AMOUNT (direct + indirect) = $27,688.88 <br />