Laserfiche WebLink
Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task 4: 207 State: Colorado Abbreviation: None <br />Date: 5/4/2012 County: Las Animas Filename: C012 -207 <br />User: JRS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series 11 LGP <br />Horsepower: 238 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ow nership Cost /Hour: <br />Operating Cost /Hour: <br />Ripper op. Cost /Hour: <br />Operator Cost /Hour: <br />Total unit Cost /Hour: $165.04 <br />Total Fleet Cost /Hour: $165.04 <br />MATERIAL QUANTITIES <br />Initial Volume: 730 <br />Swell factor: 1.125 <br />Loose volume: 821 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Av erage push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Replace Topsoil from Stockpile to Two Drill Pads and Mud Pits from MR -107 <br />Permit Action: Minor Revision 114C Permit/Job #: C1981012 <br />Agency or organization name: DRMS <br />5% <br />7,600 feet <br />Material weight: 2,550 Ibs /LCY <br />$46.30 <br />$80.25 <br />$0.00 <br />$38.49 <br />125 feet <br />428.6 LCY /hr <br />Weight description: Earth - Dry packed <br />BULLDOZER WORK <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />CIRCES Cost Estimating Software <br />