Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />205 <br />206 <br />207 <br />208 <br />Credit for MR -107 Boreholes <br />BOREHOLE <br />^ <br />^ <br />16.00 <br />$5.642.42 <br />$1.537.73 <br />$779.68 <br />$945.94 <br />Regrade Two Drill Pads and Mud Pits from MR- <br />107 <br />DOZER <br />9.32 <br />Replace Topsoil from Stockpile t Six Drill Pads <br />and Mud Pits <br />DOZER <br />4.72 <br />Reseed Drill Pads and Mud Pits with Rangeland <br />Seed Mix <br />REVEGE <br />2.76 <br />SUBTOTALS: <br />32.8 <br />$ $8,905.77 <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 210 <br />Date: 5/4/2012 <br />User: JRS <br />TASK LIST (DIRECT COSTS) <br />Minor Revision 107 Credit <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />COST SUMMARY IRK <br />Permit Action: Minor Revision 114C Permit /Job #: C1981012 <br />Abbreviation: None <br />Filename: C012 -210 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $179.90 <br />Performance bond: 1.05 Total = $93.51 <br />Job superintendent: 16.40 Total = $972.52 <br />Protit: 10.00 Total = $890.58 <br />TOTAL 0 & P = $2,136.51 <br />CONTRACT AMOUNT (direct + 0 & P) = $11,042.28 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract /bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.61 <br />3.58 <br />Total = 0.00 <br />Total = $509.05 <br />$395.31 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $3.040.87 <br />TOTAL BOND AMOUNT (direct + indirect) = $11,946.64 <br />CIRCES Cost Estimating Software <br />