My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-02_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-05-02_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:16 PM
Creation date
5/4/2012 3:34:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
5/2/2012
Doc Name
Specification Change #1: Overburden Fill Testing Frequency
From
CCVG
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 May 2012 <br />4 <br />Cripple Creek & <br />►� 0-ZLlZI <br />✓/I 1A 10 <br />Victor Gold Mining Company <br />A Joint Venture • ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 100 North 3`d Street <br />Victor, Colorado 80860 <br />(719) 689 -2977 — Fax (719) 689 -3254 <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7002 - 0510- 0001 - 8483 -3219 <br />Mr. Timothy Cazier <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Reference: Cripple Creek & Victor Gold Mining Company, Cresson Project <br />Specification Change #1: Overburden Fill Testing Frequency <br />Dear Mr. Cazier: <br />��Vl( <br />�ta17.PadeYS, <br />RECEIVED <br />,VAY 02 2012 <br />Division of Reclamation, <br />Mining & Safety <br />Enclosed is correspondence from AMEC Earth & Environmental, Inc. ( "AMEC ") in reference to a proposed <br />modification to the Construction Quality Assurance structural fill testing requirement for the mill platform from one <br />sample per 50,000 cubic yards of material placed, to a proposed frequency of one sample per 200,000 cubic yards of <br />material placed for the structural fill ( "overburden fill ") component of the Mill Pad in Squaw Gulch. <br />The proposed modification was previously discussed with you and representatives of AMEC on 23 March 2012, and <br />is only being proposed for the overburden fill component of the material being placed for the Mill Pad in Squaw <br />Gulch at the Cresson Project. <br />Should you have any questions, please do not hesitate to contact me at (719) 689 -4055. <br />Sincerely, <br />/ <br />bow— <br />Timm Comer <br />Manager, Environmental Resources <br />Enclosures: Specification Change #1 — Overburden Fill Testing Frequency, Cripple Creek & Victor Gold <br />Mining Company, Cresson Project, AMEC Earth & Environmental, Inc., dated 5 April 2012. <br />Xcopy: Ron Roberts, Construction Manager, CC &V Gold Mining Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.