Laserfiche WebLink
MINED LAND RECLAMATION ANNUAL REPORT <br />Date: April 24, 2012 <br />Permit Number: M- 2002 -020 <br />Operation Name: 25 Avenue Site (Poudre Ponds) <br />Permittee: City of Greeley <br />Submitted by: Angela Miles Fiore, Water Resource Administrator <br />(970) 350 -9209, angela.milesfiore@greeleygov.com <br />Si{ <br />RECEIVED <br />MAY 042012 <br />Division of Reclamation, <br />Mining & Safety <br />1. Extent of current disturbances. <br />There were no mining disturbances in 2011. A chain -link perimeter fence was erected around <br />the south and east sides of Ponds 1 and 2. The fence on the north side between the ponds and <br />poudre trail was removed. A mine identification sign was posted at the entrance of the mine <br />site. <br />2. Reclamation accomplished to date and during preceding year. <br />The reclaimed end use for the area under the mining permit is water storage. The reclamation <br />accomplished to date revolved around the construction of the slurry wall (completed in 2002) <br />and inlet and outlet facilities needed to operate the storage facility (completed in 2005). In 2003, <br />Greeley's 25 Ave. gravel lake storage project met the Colorado State Engineer's Office <br />performance standard for Tined gravel pits. After meeting this standard for Tined reservoirs, <br />Greeley initiated and substantially completed the inlet and outlet facilities for the storage facility <br />in 2004. Greeley removed tamarisk from the side slopes in 2005. <br />3. New disturbances anticipated to occur during upcoming year. <br />LaFarge completed mining the berm between the lakes in 2004 and opted to discontinue <br />removing material below the present bottom of the existing lake(s). The disturbed slopes were <br />reclaimed per the Reclamation Plan. It is estimated that over one million cubic yards remains <br />above the bedrock elevation. Greeley plans to reclaim the remaining material within the next <br />few years, as soon as conditions support the economic feasibility of removing the remaining <br />material. There are no plans to mine in the current year. <br />4. Reclamation to be performed during upcoming year. <br />On -going mowing and manual weed removal as needed. <br />5. Dates for the beginning of active operations. <br />Active mining began at the site in December of 2003. <br />6. Date active operation ceased for the year, if any. <br />December 2004. <br />