My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2012-05-04_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:21 PM
Creation date
5/4/2012 9:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/4/2012
Doc Name
Email Regarding Reclamation Cost Estimate
From
Susan Burgmaier
To
Mike Boulay
Type & Sequence
PR5
Email Name
SLB
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadside Portals (C1981041) PR -5 Page 34 of 80 <br />HYDRAULIC EXCAVATOR WORK <br />Task description: Excavate Portal Area for New Drainage Channels <br />Site: Roadside Portals Pen Action: Permit Revision 5 <br />PROJECT IDENTIFICATION <br />Task #: 092 State: Colorado <br />Date: 5/3/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 320D L 9' -6" Stick <br />Attachment 1: ROP S Cab <br />Abbreviation: None <br />Filename: C041 -092 <br />Horsepower: <br />148 <br />Weight (MT): <br />21.55 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Utilization % <br />Ownership Cost/Hour: $24.63 NA <br />Operating Cost/Hour: $50.51 100 <br />Operator Cost/Hour: $38.67 NA <br />Total Unit Cost/Hour: $113.81 <br />Total Fleet Cost/Hour: $113.81 <br />MATERIAL QUANTITIES <br />Initial volume: 1,110 CCY Swell factor: <br />Loose volume: 1,293 LCY <br />Source of estimated volume: Exhibits 6C and 26 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />BELOW AVERAGE <br />SEVERE <br />0.333 minutes <br />Bucket Size Class: Small <br />Rated Capacity: 0.98 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90 %) 0.850 <br />Adjusted Capacity: 0.83 LCY <br />Job Condition Correction Factors Site Altitude: 5000 feet <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />10.38 <br />Pennit /Job #: C1981041 <br />150.09 <br />124.57 <br />124.57 <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.