Laserfiche WebLink
Page 15 of 80 <br />MOTOR GRADER WORK <br />Task description: Finish Grade Remaining Reclamation Areas <br />Site: Roadside Portals Permit Action: Pewit Revision 5 Permit/Job #: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 059 State: Colorado <br />Date: 5/1/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 70.00 <br />Source of estimated acreage: Division Estimate <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />mph <br />Production Deration - 1.25 <br />30 <br />degrees <br />12.10 <br />Utilization % <br />Ownership Cost/Hour: <br />$42.77 <br />10.10 <br />NA <br />Operating Cost/Hour: <br />$69.88 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.86 <br />NA <br />Total Unit Cost/Hour: <br />$151.51 <br />Total Fleet Cost/Hour: <br />$155.11 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 70.00 <br />Source of estimated acreage: Division Estimate <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />mph <br />Production Deration - 1.25 <br />30 <br />degrees <br />12.10 <br />feet <br />2.00 <br />feet <br />10.10 <br />feet <br />1.5303 <br />acres/hour <br />Site Altitude: 5000 feet <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />1.3008 <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $116.48 <br />Grader(s) <br />per acre <br />1.25 <br />1.3008 <br />Total job time: <br />Total job cost: <br />acres/Hour <br />acres/Hour <br />53.81 Hours <br />Abbreviation: None <br />Filename: C041 -059 <br />$8,153.00 <br />CIRCES Cost Estimating Software <br />