My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2012-05-04_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:21 PM
Creation date
5/4/2012 9:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/4/2012
Doc Name
Email Regarding Reclamation Cost Estimate
From
Susan Burgmaier
To
Mike Boulay
Type & Sequence
PR5
Email Name
SLB
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 80 <br />SCRAPER TEAM WORK <br />Task description: <br />Site: Roadside Portals <br />Haul Cover from CBA -2 to CRDA #1 <br />Permit Action: Permit Revision 5 <br />PROJECT IDENTIFICATION <br />Task #: 020 State: Colorado <br />Date: 5/1/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 623G <br />- Dozer: NA <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $877.76 <br />MATERIAL QUANTITIES <br />Initial volume: 1,452 CCY <br />Loose volume: 1,692 LCY <br />Source of estimated volume: Exhibits 9A, 9 <br />Source of estimated swell factor: Cat Handbook <br />Swell factor: 1.165 <br />51 and 52 <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$64.15 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$116.61 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$219.44 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$877.76 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $877.76 <br />MATERIAL QUANTITIES <br />Initial volume: 1,452 CCY <br />Loose volume: 1,692 LCY <br />Source of estimated volume: Exhibits 9A, 9 <br />Source of estimated swell factor: Cat Handbook <br />Swell factor: 1.165 <br />51 and 52 <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: <br />2,900 lbs/LCY <br />Material description: <br />Decomposed rock - 50% Rock, <br />23.00 <br />50% Earth <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />19.03 LCY <br />COSTShift basis: 1 per day <br />iption <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />19.03 <br />LCY <br />Permit/Job #: C1981041 <br />Abbreviation: None <br />Filename: C041 -020 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.