27. Dioxin Testing: Each applicant must report qualitative data, generated using a screening procedure not calibrated with analytical standards,
<br /> for 2,3,7,8-tetrachlorodibenzo-p joxin(I-CDD) if is
<br /> (a) Uses or manufactures 2,4,5-trichlorophenoxy acetic acid (2,4,5;T1 , 2-(2,4,5-trichlorophenoxy)propanoic acid (Silvex, 2,4,5,-TP); 2-
<br /> (2,4,5-tricblorophenoxy)ethyl, 2,2-dichloropropionate(Erbon); 0,0-dhethyl 0-(2,4,5-trichlorphenyl)phosphorothioate(Ronnel); 2,4,5-
<br /> trichloropheaol(TCP); or hexachlorophene(HCP); or
<br /> (b) Knows or has reason to believe that TCDD is or may be present in an effluent.
<br /> 23. Whole Effluent Toxicity Testing: WET testing shall be conducted for each ouffall which is not solely made up of stormwater or domestic
<br /> wastewater, unless waived by the Division, on 100% effluent using both Ceriodanhnia dubia and fathead minnows. This requirement is
<br /> waived where routine testing is currently required under an existing CDPS permit. The test shall be an acute test unless the ratio of stream
<br /> low flow to effluent design flow is less than 10:1, respectively,and the receiving stream has a Class 1 Aquatic Life Use or Class 2 Aquatic
<br /> Life Use with all the appropriate aquatic life numeric standards. In the latter case, a chronic test is required, The Division reserves the right
<br /> to request additional testing as part of the application review process. If so required, the permit application will not be considered complete
<br /> until the additional testing is submitted. In addition, all applicants must identify any biological toxicity tests which have been performed
<br /> within the last 3 years on any of the discharges or the receiving water in relation to a discharge from this facility. Attach WET test results to
<br /> this application.
<br /> 29. Priority Pollutant Scan: The results of a priority pollutant scan, unless waived by the Division, for the volatile and acid fractions as shown
<br /> in Appendix A must be submitted of each discharge which is not solely made up of stormwater or domestic wastewater. This requirement is
<br /> waived for facilities where the probable total annual production is less than 100,000 tons per year.
<br /> 30. Additional Monitoring: All applicants must review the parameters listed in Appendix A and Appendix B to this application and indicate
<br /> whether any of these pollutants are known or believed to be present. For every pollutant expected to be discharged,the applicant must
<br /> briefly describe the reasons the pollutant is expected to be discharged and report any quantitative data for the pollutant.
<br /> None .
<br /> 31. DMG Monitoring: Please submit a copy of summaries of all water quality monitoring data of oudhUs or receiving streams for which data
<br /> has been gathered over the last five years for the mining site and which is required by the Division of Minerals and Geology. If not already
<br /> submitted to the Division, the plan which derails the monitoring frequency,type, locations and method of analysis must also be submitted.
<br /> 32. Bulk Storage: Do you have bulk storage of diesel fuel, gasoline,solvents or other hazardous materials on site? No 2 Yes ❑ If
<br /> Yes. briefly list materials, their quantity, measures taken to ensure that spills do not enter state waters and indicate their location on
<br /> site sketch, Item L.
<br /> T\T n r G_
<br /> For renewal applications, list the date when the most recent Materials Containment Plan was submitted. See attached
<br /> 33. Activity Duration: When did the mining operation commence? 1956 Ended 1991
<br /> Estimated life of the activity- years.
<br /> 34. Pollution Prevention Plans: Please describe any pollution prevention or best management plans currently in place that could result in the
<br /> improvement of water quality. These could include solvent recycling progr
<br /> ams,material conm=ent
<br /> procedures,education, etc.
<br /> Ongoing reclamation of the former mine site .
<br /> 35. Historic Drainages: Does historic drainage exist at the site, which is not covered under a CDPS permit? Yes ❑ No ® if so,
<br /> please provide a map showing the location of the discharges and copies of all analytical information on the discharges. Please sample the
<br /> discharges for the parameters listed in item 26 and submit those results. This requirement may be waived by the Division if suitable data on
<br /> the dis narge's historic quality exists.
<br /> 36. Additional Information: Please include any other information that You feel the Division should be aware of in drafting this permit. Include
<br /> here any flow or stream data that you would like considered. Atmcli pages as necessary.
<br /> See attached . Mid—Continent is no longer owner of property; DMG is
<br /> carrying out reclamation , wltn no or-ner d
<br /> site . Reclamation is nearing completion.
<br /> 37. Stormvrater Discharges: All active and inactive coal mines must be covered by a stormwater permit. If your facility does not already have
<br /> a stormwater permit, complete Appendix C-1 and submit in addition to this application. ALSO, SEE ITEM 38.
<br />
|