6. Industrial Activity: Describe the primary industrial activities which take place on site. Include the type of facility (underground mine,
<br /> surface mine, etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining
<br /> and coal preparation processes where applicable. Ube applicant may want to submit a process flow sheet.)
<br /> None Mi ni nrT reaRPd i n 1 991 Surfar - f a r i 1 i ti PG have hPen rPmn rPrl .
<br /> raw coal storage areas have been graded and covered , portals have been
<br /> sealed . Backfill , grading and seeding have been completed at mine
<br /> por a areas , and roads to several portals have been reclaimed .
<br /> Lamphouse and one metal building remain .
<br /> 7. Indicate whether an exploratory, active mining, inactive mining, or post mining operation or is the site in temporary cessation.
<br /> post mining . Reclamation is being carried out by the DMG.
<br /> If exploratory, please submit any known water quality/quantity data relative to the discharge(s) and the receiving stream(s) that reflect the
<br /> conditions prior to the present activity, the length of time the activity is expected to be under exploration and describe what activities will
<br /> take place during exploration that could have an impact on the quantity or the quality of the discharge. If post mining, describe areas
<br /> affected and extent of reclamation completed and length of time elapsed since revegetation occurred. Also, specify whether any outfalls
<br /> previously described serve,partially or totally, a reclaimed area. Include expected bond release date.
<br /> N/A
<br /> 8. Production: List the principal product(s)produced and current and maximum production rates.
<br /> Non
<br /> 9. Is tj is a seasonal operation? No ❑ Yes ® If Yes, please list the months of operation.
<br /> lo. Intermittent Discharges:Except for storm runoff, are any of the discharges described in item 21 intermittent or seasonal?
<br /> No ❑ Yes © If Yes, describe the frequency, duration and flow rate'of each discharge occurrence.
<br /> no, Fginp
<br /> ing spf ing ...
<br /> as snowmelt occurs & miarates into the undergrond workinaG from
<br /> which a pipe drains to the 003 sump. Est flow of 10 gpm.
<br /> 11. Location Map: A 81F_ x 11 inch location map designating the facility property, intake points, discharge points, each of its hazardous waste
<br /> treatment storage or disposal facilities, areas in post mining, each well where fluids from the facility are injected underground,those wells,
<br /> springs, other surface water bodies and drinking water wells listed in public records or otherwise known to the applicant and the receiving
<br /> waters shall be submitted. The map shall extend one mile beyond the property boundaries. The map shall be from a 71fs or 15 minute USGS
<br /> quad sheet, or a trap of comparable scale. A north arrow shall be shown. A larger map may be included for reference if the permiace
<br /> wishes.
<br /> 12. Site Map: A 81A x 11 inch trap of the site shall be submitted showing facility features (whenever possible) such as buildings, ponds,
<br /> diversion ditches, stream locations, numbered discharge points, sampling and flow monitoring points, land application areas, stockpiles, wzste
<br /> rock piles, topsoil piles, location of french drains and/or spoils springs, crusher areas, mine drainage flow paths, domestic wastewater
<br /> treatment plants, power plants, truck washing areas, explosive storage areas,parking lots, vehicle maintenance areas. chemical storage areas,
<br /> etc. The oud4alls shall be labeled to correspond with the numbers listed in item 21. A larger trap may be included for reference if the
<br /> permiaze wishes.
<br /> 13. Water Balance: Anach a lime drawing showing all water flow through and from the mine/preparation plant sites. Indicate sources of intake
<br /> water, operations contributing wastewater to the effluent, and treatment units labeled to correspond to the more detailed descriptions in item
<br /> 21. Construct a water balance on the line drawing by showing average flows between intakes, operations,treatment units and outfalls. If a'
<br /> water balance cannot be determined, provide a pictorial description of the nature and amount of any sources of water and any collection or
<br /> treatment measures. If not applicable, please indicate.
<br />
|