Laserfiche WebLink
4. In its accounting, served on defendants on January 23, 1998, the DMG listed <br /> reclamation projects that still need to be performed at MCR's mine site and at the Carbondale <br /> Loadout Facility. With respect to each of the reclamation projects, state whether defendants <br /> believe such project is required under MCR's permit, and the basis for your answer as to each of <br /> the projects. The reclamation projects are as follows: <br /> a. Roads A, B, C, D, Huntsman <br /> b. Pond Removal <br /> c. Rock Tunnel Vicinity <br /> d. Facilities Area. <br /> e. Facilities Area Demolition <br /> f. Mine Bench Outslope Revegetation <br /> g. Mine Maintenance <br /> h. Seed Bid <br /> i. Soil Analysis <br /> j. Tree Purchase and Planting <br /> k. Loadout Reclamation <br /> 1. Contamination Soils Disposal <br /> m. Contaminated Subsurface Disposal <br /> n. Remediate Leach Fields <br /> 5. Identify any and all documents which were referred to or relied upon to support your <br /> answer to Interrogatory 4. <br /> 9 <br />