Laserfiche WebLink
contractor under the MLRB Reclamation Bond? If not, please explain any differences. <br /> 6. Do you agree that the amount set forth under the column captioned"D-IG <br /> Work" shows an accurate allocation of costs under the MLRB Reclamation Bond? If not, <br /> please explain any differences. <br /> 7. Do you agree that the amount set forth under the column entitled <br /> "Remaining Work" accurately sets forth the cost allocations under the MLRB Reclamation <br /> Bond? If not, please explain any differences. <br /> 8. Do you agree that the amount set forth under the column "Actual Costs <br /> Remaining Work" accurately sets for the costs of work to be performed? If not, please <br /> explain any differences. <br /> DMG Reclamation Accounting <br /> 9. Referring to the DMG Reclamation Accounting,please state the name(s) of <br /> the person(s) (as defined in Instruction ¶ F. above) who prepared the DMG Reclamation <br /> Accounting. If the DMG Reclamation Accounting was prepared by more than one person, <br /> state which part or parts was prepared by which named person. <br /> 10. Please state the education,training,and experience of each person involved <br /> in preparation of the DMG Reclamation Accounting. <br /> 11. Please describe each document relied upon by the persons preparing the <br /> DMG Reclamation Accounting as such description is requested in Instruction ¶ E above. <br /> 12. Please state the name(s) of the person(s) who have possession of the <br /> documents, as to each document, relied upon in preparing the DMG Reclamation <br /> Accounting. <br /> 13. Please state why the DMG Reclamation Accounting follows a different <br /> analysis or format than the MLRD Mid-Term Review- 1991. <br /> DMG Reclamation Cost Estimate Summary <br /> Referring to the captions "Reclamation Cost Estimate Summary", page 4, and <br /> "Estimated Reclamation Costs by Anticipated Project", pages 7-29 inclusive, of the DMG <br /> Reclamation Accounting itself, please respond to the following: <br /> 14. Is all of the work and cost detailed considered to be within the scope of the <br /> approved MLRB Reclamation Plan?If not,please detail items outside the scope of the Plan. <br /> INMAL LNTERROGATORIES <br /> CIVIL No.97 cv 131-3 -9- PROPOUNDED To DMG BY MCR <br />