My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-03-12_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1998-03-12_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2021 10:02:10 AM
Creation date
5/2/2012 2:24:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/12/1998
Doc Name
3rd party defendant's answers to initial interrogatories
From
US Dristict Court
To
Mid-Continent Resources Inc. & DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision file, approval dated November 22, <br />1983. Approval cover letter signed by Jim Herron, addressed to <br />Doug Bowman, Mid - Continent Resources; approval to construct coal <br />blending facility; eighteen pages. <br />Correspondence dated August 27, 1984 signed by Douglas <br />Bowman, Mid - Continent Resources, to Jim Herron, request to amend <br />permit revision to construct access road near Sutey Pile. Four <br />pages. <br />Correspondence dated July 8, 1984 signed by Douglas <br />Bowman, Mid - Continent Resources, to Candace Thompson outlining <br />rill and gully repair. Two pages. <br />Minor Revision 46 File, dated November 5, 1993, signed <br />by Diane Delaney, addressed to Division Minerals and Geology, <br />regarding revised Load Out reclamation plan. Twenty -four pages. <br />Estimating form titled Bulldozer Ripping; dated March <br />15, 1995; no addressee; cost estimating form; estimated cost of <br />performing earth ripping with bulldozer; one page <br />Structural Demolition worksheet pages 3, 4, 5, 7, dated <br />March 15, 1995; no addressee; cost estimating form; estimated <br />cost of completing structural demolition. Eight pages. <br />Estimating form titled Seal and Plug Piezometers, dated <br />March 20, 1995 no addressee; cost estimating form; estimated cost <br />of sealing monitoring wells. One page. <br />Estimating form titled Seal and Plug Monitoring Wells, <br />dated March 20, 1995 no addressee; cost estimating form; <br />estimated cost of sealing monitoring wells. One page. <br />Estimating form titled Bulldozer Work, dated January 15, <br />1998; no addressee; cost estimating form; estimated cost of <br />removing sediment ponds. Seventeen pages. <br />Untitled topographic map of the Wash Plant to Rock <br />Tunnel Area, dated September 2, 1994. <br />Letter to Lou LaGiglia, dated October 8, 1997, with <br />copies to David Bucknam, Jim McArdle, Cheryl Linden, Bert King, <br />Michael Ebert; from Steven Renner. Correspondence regarding <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.