Laserfiche WebLink
Response: See Response to Interrogatory 2 . <br /> 8 . Do you agree that the amount set forth under the <br /> column "Actual Costs Remaining Work" accurately sets for the <br /> costs of work to be performed? If not, please explain any <br /> differences. <br /> Response: No. Please refer to the Division' s January <br /> 23 , 1998 Accounting which has been served on the Defendants . The <br /> Accounting sets forth the tasks still needed to be performed at <br /> the mine site and their estimated costs. <br /> DMG Reclamation Accounting <br /> 9 . Referring to the DMG Reclamation Accounting, <br /> please state the name (s) of the person(s) (as defined in <br /> Instruction ¶ F. Above) who prepared the DMG Reclamation <br /> Accounting. If the DMG Reclamation Accounting was prepared by <br /> more than one person, state which part or parts was prepared by <br /> which named person. <br /> Response: Steven G. Renner, Environmental Protection <br /> Specialist, Coal Program, 2148 Broadway, No. C-5, Grand Junction, <br /> Colorado 81503 (970) 241-0336 . Employed by the Division. Mr. <br /> Renner is the lead specialist at the Coal Basin site and was the <br /> specialist who prepared the accounting. <br /> 10 . Please state the education, training, and <br /> experience of each person involved in preparation of the DMG <br /> Reclamation Accounting. <br /> Response: Steven G. Renner <br /> Education: Bachelor of Science, Mesa State College, <br /> Grand Junction, Colorado <br /> Experience and Training: Hydrologic Technician, United <br /> States Geologic Survey (2 years) ; Hydrologist, Jex Piland <br /> Engineers and Geologists (1 year) ; Reclamation Specialist, Coal <br /> and Minerals regulatory programs (4 years) , Senior Reclamation <br /> Specialist, Minerals Regulatory Program (2 years) ; Supervising <br /> Reclamation Specialist (3 years) ; Environmental Protection <br /> Specialist (3 . 5 years) ; Mined Land Reclamation Division\Division <br /> of Minerals and Geology. Mr. Renner' s job responsibilities <br /> include preparing bids for reclamation tasks at mine sites <br /> 4 <br />