Laserfiche WebLink
will be made available for inspection at a mutually convenient <br /> time at the Division' s offices in Denver and\or Grand <br /> Junction. <br /> 38 . In connection with Coal Preparation Plant power <br /> pole removal, is electric power to be provided to the Rock <br /> Tunnel lamphouse? <br /> Response: No. <br /> 39 . In connection with mild slope revegetation for the <br /> Coal Preparation Plant/bathhouse area, are there documents <br /> describing the scope of this work and its costs . If so, please <br /> attach a copy of such documents to your responses to these <br /> interrogatories or state the circumstances under which these <br /> documents may be inspected and/or copied. <br /> Response: There are documents which describe the scope <br /> of this work. These documents will be made available for <br /> inspection at a mutually convenient time at the Division' s <br /> offices in Denver and\or Grand Junction. <br /> The scope of accomplishing revegetation on slopes of <br /> 3H: 1V or shallower includes seed distribution at the <br /> appropriate rate per acre by hand, drill or hydro-seeding, <br /> seed bed preparation, acquisition and application of <br /> fertilizer, acquisition and application of mulch including <br /> crimping. Under this cost, the contractor will assume <br /> responsibility for maintenance of project area until released <br /> from site. <br /> 40 . In connection with the Sutey refuse pile (located <br /> northerly and westerly of the Coal Preparation Plant in <br /> Section 10, T. 10S. , R. 89W. , 6th P.M. , see attached USG Quad <br /> Sheet Placita, Colo. Segment) , please describe the work that <br /> remains in connection with Ditch #8 at the Sutey refuse pile. <br /> Are there documents describing this work and its costs . If so, <br /> please attach a copy of such documents to your responses to <br /> these interrogatories or state the circumstances under which <br /> these documents may be inspected and/or copied. <br /> Response: The Division anticipates that Ditch 8 may <br /> require reconstruction in order to ensure the long term <br /> stability of the channel and of the adjacent Sutey Refuse <br /> Disposal Area. The channel may need to be excavated farther <br /> 23 <br />