My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-05-29_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1998-05-29_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 11:36:40 AM
Creation date
5/2/2012 2:23:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/29/1998
Doc Name
Rule 26 disclosure pursuant to case management order
From
US District Court
To
Mid-Continent Resources, Inc. & DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47. Report dated September 20, 1989. Prepared for Mid-Continent Resources by <br /> InterMountain Soils, Inc. Regarding steep slope test plot studies. 9 pages. <br /> 48. Invoice dated July 21, 1997 from Colorado State Forest Service to Division <br /> Minerals and Geology. Regarding seedling tree purchase. 1 page. <br /> 49. Untitled Topographic Map. Prepared by Air Photo Surveys, Inc; dated September <br /> 22, 1994. Regarding topography of lower Dutch Creek and Coal Creek vicinities. <br /> 50. Proposed Decision and Findings of Compliance, Permit Revision Number 3; dated <br /> July 22, 1992. Regarding changes to reclamation plan. 13 pages. <br /> 51. Correspondence dated June 12, 1995; addressed to Dave Bucknam, signed by <br /> James Pendleton. Regarding Dutch Creek Flume. 4 pages. <br /> 52. Coal Basin/Rock Tunnel Project; Field Directives No. 1 (July 26, 1996) and No. 2 <br /> (August 16, 1996). Regarding Rock Tunnel Drainages System. 2 pages. <br /> 53. Coal Basin/Waste Pile Project; Field Directives No. 4 (October 10, 1995 and <br /> Change Order No. 4 (November 27, 1995); Regarding changes to Sutey Ditch 8 <br /> construction. 2 pages. <br /> 54. Coal Basin/Waste Pile Project; Suspend and Resume Work Order No. 4a(October <br /> 10, 1995) and Suspend and Resume Work Order No. 4b (October 28, 1995).. <br /> Regarding changes to Sutey Ditch & construction. 2 pages. <br /> 55. Coal Basin/Mine 4 Project; Change Order Number 1, dated September 14, 1995. <br /> Regarding revegetation practices. 1 page. <br /> 56. Coal Basin/Mine 4 Project; Change Order Number 2, dated September 20, 1995. <br /> Regarding excavation of various areas. 1 page. <br /> 57. Coal Basin/Mines 1 and 2 Project; Field Directive Number 2, dated September 11, <br /> 1996. Regarding Road D reclamation. 1 page. <br /> 58. Coal Basin/Rock Dump Project; Change Order Number 1, dated August 30, 1996. <br /> Regarding excavation of borrow area, removal of excess soil materials. I page. <br /> 59. Coal Basin/Warehouse Project; Change Order Number 1, dated October 3, 1997. <br /> Regarding enhancement of reclamation through excavation and revegetation <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.