Laserfiche WebLink
Mid-Continent Resources , Inc . <br /> Topsoil Replacement at Sutey Refuse Pile <br /> Request for Proposal <br /> Scope of Work <br /> The enclosed map at a scale of 1 "= 100 ' shows the current <br /> configuration of the Sutey coal refuse pile . The pile is located <br /> near Redstone , Colorado . The area highlighted in yellow shows the <br /> area where topsoil must be spread . North and east slopes should <br /> receive 12 to 18 inches , west slopes should get 18 to 24 inches and <br /> south slopes should get 24 to 30 inches . <br /> Also shown are two topsoil stockpile areas which are the sole <br /> source of the soil . Assuming an average depth of 20 inches over an <br /> area of 13 . 1 acres , this results in a volume of approximately <br /> 35 , 000 cubic yards . <br /> A scraper is the most efficient machine to perform the work . Since <br /> a scraper initially removed the topsoil from the area and built the <br /> two stockpiles , little dozer help should be needed ; nevertheless , <br /> any loading assistance will be provided by Mid-Contnent . <br /> Approximate haul parameters : <br /> - average haul distance is approximately 560 feet <br /> - an average loaded grade of 9 . 5% . <br /> Other items : <br /> - soll should be spread as evenly as possible to minimize final <br /> grading work by dozer (not part of this work ) . <br /> - spreading operation should minimize compaction , where possible . <br /> The bid should be lump sum and bidder should provide all labor , <br /> materials , fuel and equipment needed for the job . Bidder must <br /> provide general liability insurance for $ 1 , 000 , 000 . All of the <br /> successful bidder ' s personnel to be used on the site must have <br /> current worker ' s compensation . The work will take place in June of <br /> 1994 . Please reply within 7 days . <br />