My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-23_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2012-04-23_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:43 PM
Creation date
5/1/2012 12:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
4/23/2012
Doc Name
Response to OSM Notification of Citizen Complaint (Emailed)
From
DRMS
To
OSM
Inspection Date
4/23/2012
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apri123, 2012 C- 1981- 012/New Elk Mine JHB <br />Topsoil pile 2 has been shaped and graded. Stabilization seed mix needs to be seeded on to this pile to stabilize <br />and minimize invasion by noxious species. <br />Subsoil pile has also been graded and shaped. NECC needed a temporary location to dry pond cleanings from <br />Pond 6 and 7. NECC has constructed a cell to dry the excavated sediment on top of the subsoil stockpile. When <br />this material is dry enough to handle, it will moved to the RDA for final disposal. The Division confirmed this <br />activity. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions are being taken as a result of the anonymous tip through the OSM tipline. No <br />evidence was found substantiating that any waste had been dumped into the Purgatoire River at the New <br />Elk Mine operation. The banks of the Purgatoire were walked and observed along the length of the active <br />mining facilities. The effluent from Pond 001 met the CDPHE standards for pH and TDS. No evidence <br />of a violation of discharge of non - compliant effluent could be substantiated. <br />The Division continues to evaluate the construction of the DWDA. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.