Laserfiche WebLink
April 23, 2012 C- 1981- 012/New Elk Mine JHB <br />Photo 13: North side of the River looking towards the west. DWDA pile on the right side of <br />photo <br />Photo 14: South side of DWDA. 8 -12 ft. dozer corridor plus Ditch D14 between berm and <br />Purgatoire River on left side of photo. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 13 of 16 <br />