My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-01-15_GENERAL DOCUMENTS - C1981017 (4)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-01-15_GENERAL DOCUMENTS - C1981017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 12:41:50 PM
Creation date
5/1/2012 9:46:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/15/1993
Doc Name
Reclamation concepts
From
Mid-Continent Resources, Inc.
To
Holden & Jessop. P.C.
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i�uu�R .r��rlivG i i L.,. ivu JJJ '�•tJ-GJv./ uCu 6 , �L LG •GJ i Ji <br /> Timing/Schedule <br /> Work done with Mid-Continent's own on-slte equipment allows considerable cost <br /> savings over work done witl- rented equipment. As the M. & E. contract allows them to <br /> sell this equipment within three years, we are anxious to complete as much as possible <br /> during the summers of 1993 and 1994. <br /> At the same time, our schedule will be dictated by the timing of M.& E./King in removing <br /> structures, and by availability of funds. The Division stressed at the meeting that we <br /> should be careful not to ove•-commit on our reclamation schedule. <br /> Thei likely schedule of work during 1993 is as follows: <br /> Portal Sealing <br /> We've indicated to th-a Division that the foremost priority of work during the next <br /> summer construction season will be portal sealing. <br /> Raw Coal Storage Area <br /> When the ground clears of snow at the raw coal stockpile areas, we plan to push <br /> the coal material which is still on the ground up against the cut of the <br /> Coal Refuse Pile <br /> If this does not require all available equipment, we hope to cover most of the <br /> coal refuse pile with topsoil using loaders which belong to Mid-Continent.6 This <br /> use of our own equipment should be a considerable savings as the Division's <br /> bond calculation assumes equipment rental. <br /> #5 Mine Bench <br /> We then anticipate grading work on the #5 mine bench area, which can probably <br /> be done with Mid-Continent's bulldozer (currently on-site). We'll anticipate use <br /> of Mid-Continent's loaders for"borrow" of topsoil. <br /> #344 Mine Benches <br /> If M. & E. gets Mine Elenches#3 and#4 cleared, we hope to do the grading on <br /> these areas as well. This may require rental of equipment. <br /> We will, of course, have further discussions with the Division on all of these items. I'll <br /> let you know as we progress:. <br /> Sincerely, <br /> Diane Delaney <br /> e Estimated cost per reclamation bond: <br /> Replace Topsoil on Sutey Refuse Pile 116.250 <br /> IS"depth <br />
The URL can be used to link to this page
Your browser does not support the video tag.