Laserfiche WebLink
Ituu�f ✓�.�r � I Li IVv . NVJ -�4J LJJJ JGfI . 1 a.D • 14 r .UO <br /> 1 <br /> MEMO <br /> To: Robert Delanoy <br /> JAN 1 5199 5 <br /> From: Diane Delaney <br /> D?Vi,_ <br /> RE: Equipment repairs. MINERALS <br /> January 13, 1993 <br /> Total requested for equipment repair or estimate of needed repair: $31,223.99 <br /> #16 Motor Grader. <br /> Pay engine repairs Bill outstanding 14,875.86 <br /> Installation cost $48.50 hr. x 24 hrs. 1115.00 <br /> Mileage $1.95 per mile x 280 miles 548.00 <br /> (est.80 miles x 3 days) <br /> Servicing equipment, Est. 10% 2052.13 <br /> replacement of fluids, filters <br /> & hoses <br /> "Assumes no lost or stolen <br /> parts to be replaced or <br /> repaired. <br /> $18,589.99 <br /> of <br /> 945 Loader <br /> Repair or replace radiator Radiator to Glenwood Radiator Replace = $1,500 <br /> Labor 2 2-1/2 days labor x$34 per 1,360 <br /> man/hour x 2 men = <br /> Total $2,860.00 <br /> 980 Loader <br /> Brake problem. Est. 4 hours x 46.50 per hour $188 <br /> Cat mechanic should look <br /> at brakes to determine <br /> extent of repairs noeded.. <br /> Transportation from/to $156 <br /> Glenwood=est. 80 miles <br /> x 1.95 per mile <br /> Total $342.00 <br />