My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-30_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2012-04-30_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:01 PM
Creation date
5/1/2012 8:33:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
4/30/2012
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Paul Bruss, E.I. Page 4 <br />April 30, 2012 <br />continue during the terms of this approval. At least three years prior to completion of <br />dewatering, a plan must be submitted that specifies how the post pumping dewatering <br />depletions (including refilling of the pit) will be replaced, in time, place and amount. If <br />dewatering of the site is discontinued, the pit would fill and cause additional depletions to <br />the stream system due to increased evaporation. <br />8. Accounting of water in this plan, including excavating area, area of actual groundwater <br />exposure, pumping for dust control, mined product, lagged stream depletions, and <br />replacement water deliveries must be provided to the Water Commissioner and Division <br />Engineer on forms and at times acceptable to them. Said accounting must be emailed to <br />the Division Engineer (Div2Ground.Water(a state.co.us) and the Water Commissioner <br />(Pete.Kasper @State.co.us) by the 10 of the month following the month being reported. <br />The name, mailing address, and phone number of the contact person who is responsible for <br />operation and accounting of this plan must be provided on the accounting forms. <br />9. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below the <br />water table, and all other use of water at the pit, must cease immediately. <br />10. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this plan. <br />11. Should a request for renewal of this plan be needed, such renewal request must be <br />submitted to this office with the statutory fee of $257 /gravel pit at least 45 days prior to the <br />expiration date of this plan (December 17, 2013). <br />12. Acceptance of these conditions is assumed unless a letter to the contrary is received by this <br />office, the Division 2 Engineer (Steve Witte, 310 East Abriendo, Suite B Pueblo, CO 81004) <br />and the Water Commissioner (Pete Kasper, Pete.Kasper @State.co.us) within two weeks of <br />your receipt of this letter. <br />Please contact Caleb Foy in Denver at (303) 866 -3581, or Justin Zeisler, Augmentation <br />Coordinator, in Pueblo at (719) 542 -3368, if you have any questions concerning this approval. <br />Attachments: Figure 1 <br />Tables 1 -4, 5A, 5B <br />cc: Steve Witte, Division Engineer (via email) <br />John Van Oort, River Operations Coordinator (via email) <br />Pete Kasper, Water Commissioner 14 & 15 (via email) <br />Division of Reclamation, Mining, and Safety <br />HCF /crf Transit Mix Pueblo East 2012 doc <br />Sincerely, <br />Heidi Frey, P.E. <br />Water Resource Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.