Laserfiche WebLink
Total acres <br />backfilled: <br />- 7 11 , c ,„ .11 <br />Total acres <br />seeded w/ <br />approved mix: <br />4- <br />Total acres <br />w /topsoil <br />replaced: <br />h <br />Total acres <br />mulched w/ <br />approved mulch: <br />4 <br />Total acres <br />graded: <br />ti' <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />4- <br />Topsoil <br />replacement <br />depth (in.): <br />I1 <br />( <br />Mulch application <br />rate (tons): <br />(00 <br />Seed <br />application <br />method: <br />���0 944 <br />Fertilizer <br />application <br />method: <br />4A./ gpel..,rn,� <br />Mulch <br />app lication <br />method: <br />p <br />( <br />Permittee Name: <br />S«z 54, ,4,"D <br />C, ,z-i- L. Lc_ <br />Permit Number: <br />M- z ©co -.4� <br />Operation Name: <br />6 m-ANs <br />12.%..-i en <br />P,a��... Paase - c <br />County: <br />--.....--,PL 45. <br />Annual Fee Due: <br />4 "i ° t 1 - <br />Anniversary Date: <br />4- (-t -7 I tz <br />Permit Acreage: <br />( te) 3 <br />e ,,� rs > <br />. <br />Current Bond Amt: <br />* (( 2 - <br />112c Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the annual fee, an annual report and map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />NO <br />NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? c, <br />5. Does the mine operate more or less than 180 days per year? MO' LESS <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />YES <br />YES Cif <br />—e <br />2 a <br />