Laserfiche WebLink
Deserado Mine C -1981 -018 <br />Cost Differences - 2012 Midterm Review vs. RN -5 <br />EC ipment <br />MTR Hr Cos <br />MTR Hours <br />MTR Cost <br />RN -5 Hr Cos <br />RN -5 Hrs <br />RN -5 Cost <br />Hr Cost Dif ' <br />Cost Di& <br />Unit Cost Difi <br />Scraper - 637 (6) <br />$2,169.72 <br />559.16 <br />$1,213,196.87 <br />$1,879.06 <br />629.31 <br />$1,182,511.25 <br />$290.66 <br />$30,685.62 <br />$48.44 <br />Dozer -D9(4) <br />$1,037.40 <br />518.45 <br />$537,885.56 <br />$830.14 <br />511.70 <br />$424,782.64 <br />$207.26 <br />$113,102.92 <br />$51.82 <br />Truckg -h <br />$623.55 <br />145.28 <br />$107,620.09 <br />$561.43 <br />140.27 <br />$78,751.79 <br />$62.12 <br />$28,868.30 <br />N/A <br />Grader- 14 <br />$130.88 <br />12.29 <br />$1,610.00 <br />$116.18 <br />15.53 <br />$1,804.28 <br />$14.70 <br />- $194.28 <br />N/A <br />Compactor <br />$130.81 <br />281.95 <br />$36,883.00 <br />$133.36 <br />119.63 <br />$15,953.86 <br />-$2.55 <br />$20,928.01 <br />N/A <br />Reveg' <br />N/A <br />835.68 <br />$252,289.13 <br />N/A <br />688.73 <br />$253,101.00 <br />N/A <br />- $811.87 <br />N/A <br />Ripper -D9(4) <br />$1,066.09 <br />10.48 <br />$11,189.00 <br />$856.57 <br />8.75 <br />$7,494.99 <br />$209.52 <br />$3,273.01 <br />$52.38 <br />Demolition <br />N/A <br />960 <br />$1,768,807.10 <br />N/A <br />960.00 <br />$2,104,394.00 <br />N/A <br />- $335,586.90 <br />N/A <br />Maintenance' <br />$313.48 <br />400 <br />$162,127.64 <br />$131.69 <br />400.00 <br />$52,676.00 <br />$181.79 <br />$109,451.00 <br />N/A <br />Mob /Demob <br />N/A <br />30 <br />$49,901.58 <br />N/A <br />26.00 <br />$53,393.00 <br />N/A <br />- $3,491.42 <br />N/A <br />Mineseal <br />N/A <br />160 <br />$36,969.42 <br />N/A <br />160.00 <br />$78,156.00 <br />N/A <br />- $41,186.58 <br />N/A <br />Borehole' <br />N/A <br />442 <br />$113,504.08 <br />N/A <br />402.00 <br />$100,547.00 <br />N/A <br />$12,957.08 <br />N/A <br />Pond Cleaning <br />$431.16 <br />61.16 <br />$26,367.82 <br />$453.50 <br />187.64 <br />$85,096.00 <br />- $22.34 <br />- $26,281.86 <br />N/A <br />Indirect Costs <br />N/A <br />N/A <br />$1,105,978.59 <br />N/A <br />N/A <br />$1,159,470.00 <br />N/A <br />- $53,491.41 <br />N/A <br />Totals <br />1 4,416.451 <br />$5,424,329.88 <br />1 4249.561 <br />$5,598,131.81 <br />1 - $141,778.38 <br />a: Same piece of Equipment regardless of task grouping. Note, these are major groupings and hours may not add up to total job hours <br />b: Hourly cost for fleet (i.e. loader and associated trucks) <br />c: Cost is hours x fleet cost. For the track and loader tasks it is actual cost from the summary sheets - see notes g and h for additional information <br />d: Cost is hours x fleet cost. For the truck and loader tasks it is actual cost from the summary sheets - see notes g and h for additional information <br />e: MTR hourly cost - RN5 hourly cost <br />f: MTR cost - RN5 cost <br />g: For the 2012 MTR and the RN5 the trucks are 769's and the loader is a 980 <br />h: For the truck and loader fleet the hourly cost is not the same for each task due to different number of trucks being used <br />- The hourly cost is the maximum fleet cost <br />is Reveg costs are based on a per acre cost, not an hourly cost. Per acre cost differs based on seeding method and seed mix. Cost total summary <br />j: Demolition costs are based on individual structures. Hourly cost for job super only. Total cost from summary sheet <br />k Maintenance costs are based on 40 hours each year for ten year liability period <br />1. Mobilization is dependent on equipment. Total cost from summary sheet <br />m: Mineseal costs are based on individual opening requirements. Hours for job super only. Total cost from summary <br />n: Borehole costs are based on each hole's sealing requirements. Hours for job super only. Total cost from summary <br />o: There are no hours associated with indirect costs. Each cost percentage of direct costs. Total cost from summary sheet <br />p: The hourly cost difference for a single piece of equipment in multi -unit fleets. Only applicable for scraper, dozer, and ripper <br />Note: Total costs and hours may differ slightly due to rounding errors <br />