My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-11-01_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-11-01_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 1:40:36 PM
Creation date
4/30/2012 10:21:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/1/1993
Doc Name
Facility environmental site assessment
From
TSP
To
Pete Lien & Sons, Inc.
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Pete Lien <br /> November 1, 1993 <br /> 03932288 <br /> Page-5 <br /> ROUGH COST ESTIMATE <br /> PITKIN IRON LIMESTONE DIVISION PROPERTY <br /> LIMITED PHASE II ASSESSMENT <br /> TASK unit Total <br /> cost <br /> Site survey, including measurements, taking 24 hrs $50.00 $1200 <br /> of samples, stabilization of critical problems <br /> Supplies and equipment for survey, $500 <br /> stabilization <br /> Investigation of disposal, transport, treatment 12 hrs $70.00 $840 <br /> resources and determination of cost, <br /> including local coordination <br /> Laboratory analysis of samples $2000 <br /> Preparation of report 12 hrs $70.00 $840 <br /> Travel, travel time, and related costs (based $1200 <br /> on 50% of work done by local engineer and <br /> one trip from Rapid City for site survey) <br /> Estimated total $6580 <br /> Contingency (20% of estimated total) $1316 <br /> Planning Estimated Total Cost $7896 <br />
The URL can be used to link to this page
Your browser does not support the video tag.