Laserfiche WebLink
Mr. Pete Lien <br /> November 1, 1993 <br /> 03932288 <br /> Page-5 <br /> ROUGH COST ESTIMATE <br /> PITKIN IRON LIMESTONE DIVISION PROPERTY <br /> LIMITED PHASE II ASSESSMENT <br /> TASK unit Total <br /> cost <br /> Site survey, including measurements, taking 24 hrs $50.00 $1200 <br /> of samples, stabilization of critical problems <br /> Supplies and equipment for survey, $500 <br /> stabilization <br /> Investigation of disposal, transport, treatment 12 hrs $70.00 $840 <br /> resources and determination of cost, <br /> including local coordination <br /> Laboratory analysis of samples $2000 <br /> Preparation of report 12 hrs $70.00 $840 <br /> Travel, travel time, and related costs (based $1200 <br /> on 50% of work done by local engineer and <br /> one trip from Rapid City for site survey) <br /> Estimated total $6580 <br /> Contingency (20% of estimated total) $1316 <br /> Planning Estimated Total Cost $7896 <br />