BURNS, FIGA & WILL, P.C. <br /> Cheryl Linden <br /> June 9, 1995 <br /> Page 10 <br /> DMG Inspection Report of October 7-8. 1993: <br /> Reclamation work has progressed nicely at the#5 Mine. There were still several <br /> days of dozer work before final grade will be achieved. At the time of the <br /> inspection the dozer was down but was being repaired by the time we left the <br /> site. Following completion of grading seeding of the site will occur. <br /> The operator had the recently approved seed mix stored at the mine office and <br /> had already stockpiled hay mulch for use at the #5 mine. At this point it does <br /> appear that the operator will complete reclamation actives at the#5 mine this year <br /> as planned . . . <br /> Around the main office/warehouse area quite a lot of work has also been <br /> completed, including: . . . final grade of the Sutey refuse pile has been completed <br /> plus some limited topsoil replacement. <br /> The stabilization work has also been completed on Dutch Creek where large <br /> riprap was placed on the cut bank below the west end of the old refuse pile. This <br /> work was completed under the Army Corps of Engineers under a nationwide <br /> permit and Minor Revision 43 from DMG . . . <br /> Also during this inspection field Minor Revision 4 was issued for repair work to <br /> commence on the Dutch Creek flume. Discussion has been ongoing for some <br /> time about how to best repair the flume. The concrete pan had been repaired <br /> earlier this summer but will not hold up through spring runoff as evidenced by <br /> recent leaks. This revision will allow placement of a 9-foot diameter steel pipe <br /> for approximately 200 feet at the lower end of the flume. A concrete support <br /> pillar will be placed behind the current flume pillar as additional support and a <br /> concrete bulkhead will be installed at the inlet side. Details of the structure were <br /> revised at the site and formal submittal is due October 12, 1993. This revision <br /> allowed initial preparation work to get underway while the final details were <br /> completed. <br /> DMR Inspection Report of November 2. 1993: <br /> Over the course of the summer of 1993 a number of enforcement actions have <br /> been issued to MCR concerning various aspects of the operation and <br /> administration of the reclamation activities. <br />