My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-26_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-04-26_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:53 PM
Creation date
4/27/2012 1:21:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
4/26/2012
Doc Name
Letter & Form and Cost Estimate
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
MR111
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: <br />Site: New Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 4/24/2012 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />Backfill and Regrade D26 Extension <br />DOZER <br />1 <br />1 <br />1 <br />7.76 <br />$616.54 <br />$248.30 <br />$219.83 <br />Replace Topsoil on D26 Extension <br />DOZER <br />3.13 <br />Reseed D26 Ditch Extension <br />REVEGE <br />2.00 <br />TOTAL O & P = <br />$523.96 <br />SUBTOTALS: <br />12.89 <br />$ 1,084.67 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: <br />102 <br />Total = <br />$21.91 <br />Performance bond: <br />1.05 <br />Total = <br />$11.39 <br />Job superintendent: <br />6.45 <br />Total = <br />$382.19 <br />Profit: <br />10.00 <br />Total = <br />$108.47 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$523.96 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />$1,608.63 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25 <br />Total = <br />$68.37 <br />Reclamation management and /or administration: <br />5.00 <br />$80.43 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$672.76 <br />of MR1II Tasks <br />Permit Action: MR111 <br />Permit/Job #: C1981012 <br />Abbreviation: None <br />Filename: 0012 -000 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,757.43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.