My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-12_REVISION - M2010007
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010007
>
2012-04-12_REVISION - M2010007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:28 PM
Creation date
4/25/2012 4:20:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010007
IBM Index Class Name
REVISION
Doc Date
4/12/2012
Doc Name
CONVERSION APPLICATION
From
NORTHWEST AGGREGATES
To
DRMS
Type & Sequence
CN1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northwest Aggregates Inc. <br />"WAND Pit" <br />Exhibit "E" <br />Reclamation Plan <br />A) Reclamation will be done immediately following the removal of gravel deposits. <br />Pond edges will be graded to 3:1 slopes and will be irregularly shaped to promote <br />wildlife habitat and wetland habitat. Trees will be planted around edges of the <br />pond and reclaimed land will be covered with 6 -10 inches of topsoil and reseeded. <br />Pond edges will be replaced with a loader and shaped with an excavator or dozer. <br />B) Post mining uses will be, wildlife habitat and livestock grazing. Other land uses <br />in the area are livestock grazing. <br />C) Reclamation plan will be implemented at the extraction of gravel deposits. <br />Mining to be done from 2012 - 2035. Reclamation to take place immediately <br />following removal of gravel deposits. After placing and shaping of reclaimed <br />land, 6 -10 inches of topsoil will be spread across reclaimed surfaces and will be <br />seeded as follows per soil conservation office. <br />D) N/A <br />E) i Affected land to be reclaimed by the summer 2011. <br />ii Phase I - 32 acres <br />iii 1 overburden placement and slope rebuilding. <br />2 berm and edge of water shaping <br />3 topsoil placement <br />4 reseeding and shrub planting <br />F) i Slopes to be graded to 3:1 <br />ii 1 Sainfoin — 2.5 lbs /acre <br />2 Bromine Smooth —1.6 lbs /acre <br />3 Intermediate Wheatgrass — 2.5 lbs /acre <br />4 Pubescent Wheatgrass — 2.25 lbs /acre <br />5 Orchard — 0.3 lbs /acre <br />iii N/A <br />iv Cottonwood and willow trees to be planted along edges of reclaimed ponds. <br />v 6 -10 inches of topsoil to be replaced on affected areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.