Laserfiche WebLink
EXECUTIVE SUMMARY ES -1 <br />1. INTRODUCTION 1 <br />1.1 Terms and Conditions 1 <br />1.2 Purpose and Scope of Work 1 <br />1.3 Project Description 1 <br />2. LAND DISTURBED IN 2011 2 <br />3. RECLAMATION ACTIVITIES IN 2011 3 <br />3.1 Constructed Wetlands Area and Adjacent Slope 3 <br />3.2 Tie Camp Creek Disposal Cell 3 <br />3.3 Erosion Control in the North and South Pits and Waste Rock dumps 4 <br />4. MONITORING AND ANNUAL REPORTING 11 <br />4.1 Slope Movement Vector Analysis 11 <br />4.2 Inclinometer Evaluation 12 <br />4.3 Pinnacle Mine Workings Monitoring 13 <br />4.3.1 Spring and Seep Monitoring 13 <br />4.3.2 Groundwater Levels 13 <br />4.3.3 Pinnacle Adit Flow 14 <br />4.3.4 Radium and Uranium Concentrations at PP -01 15 <br />4.4 Sediment Control Embankment 15 <br />4.5 Waste Rock Dumps 16 <br />4.6 Water Quality Monitoring 17 <br />4.7 Radioactive Materials License 17 <br />5. INSPECTIONS 18 <br />6. SURETY 19 <br />7. MONITORING & RECLAMATION ACTIVITIES PLANNED FOR 2012 20 <br />8. REFERENCES 21 <br />Tables <br />Table 1 <br />Table 2 <br />Figures <br />Figure 1 <br />Figure 2 <br />Figure 3 <br />Figure 4 <br />Figure 5 <br />Figure 6 <br />Summary of Annual Slope Displacement for 20010 -2011 <br />Spring and Seep Summary of Activity (1995 -2011) <br />Site Location Map <br />2008 Reclamation Areas <br />Site Layout with Monitoring Stations <br />Water Level Elevation Data <br />Hydrograph of Pinnacle Adit Discharge <br />Pinnacle Adit Discharge <br />Pitch 2011 Reclamation Finalreport 19Apr12.Doc <br />Table of Contents <br />I <br />