My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-19_REPORT - M1977004 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977004
>
2012-04-19_REPORT - M1977004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:29 PM
Creation date
4/25/2012 4:19:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
REPORT
Doc Date
4/19/2012
Doc Name
ANNUAL FEE/REPORT
From
HOMESTAKE MINING COMPANY
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piezometer <br />Location <br />Material <br />Diameter <br />(ID- Inches) <br />Depth <br />(ft BGS) <br />Screen <br />Length (ft) <br />Screen Interval <br />(ft BGS) <br />Static Water <br />09/16/2011 <br />(ft bgs) <br />IC- 10300R <br />Sch. 80 PVC <br />5 <br />208.95 <br />20 <br />188 - 208 <br />188.12 <br />IC- 10370R <br />Sch. 80 PVC <br />5 <br />207.87 <br />10 <br />197 - 207 <br />197.83 <br />Pitch Reclamation Project Colorado Mined Land Reclamation Board — 2011 Annual Reclamation Report <br />rule 16 "Standards for Plugging and Sealing Wells and Boreholes ". Piezometer construction details are is <br />presented on the table below. <br />New Piezometer Construction Details <br />Notes: <br />m = meters <br />ID- Inches = Interior Diameter in inches ft BGS = Feet Below Ground Surface ft = feet <br />The new piezometers consist of a 5 -inch interior diameter (id) schedule 80 Polyvinyl Chloride (PVC) riser <br />and screen and completed with an 8 inch interior diameter steel stick up and well cover with a 3 ft. by 3 ft. <br />concrete well apron secures the stick -up pipe. Water level measurements were first taken from the new <br />piezometers on September 9, 2011. More detailed discussions and figures are presented in the 2011 <br />Annual Geotechnical Report filed with the Division in December 2011 and in the Piezometer Replacement <br />Field Report filed with the Division in October 2011. <br />4.6 Water Quality Monitoring <br />As outlined in TR4, Homestake has monitored water quality since 1994 to verify the intended <br />effectiveness of installation of the Pinnacle Adit plug. Water quality monitoring was conducted in 2011 <br />including sampling points located at the North Pit Lake discharge (Sample Point NPL), the Tie Camp <br />Creek drainage (Sample Points TCCDRN and TCC), the site discharge POC (Sample Point SW -33), as <br />well as spring and seep surveys performed in the spring and fall. Monthly discharge- monitoring reports <br />(DMRs), pursuant to Colorado Discharge Permit System (CDPS) number CO- 0022756, were submitted to <br />the Colorado Department of Public Health and Environment (CDPHE) for 2011. Monitoring for the CDPS <br />was conducted at the designated POC SW -33, shown on Figure 3. Analytical tests conducted for the <br />DMRs at SW -33 as required by the CDPS include: flow; dissolved radium 226; total radium 226/228; total <br />uranium; pH; total suspended solids (TSS); total dissolved solids; oil and grease (visual only); potentially <br />dissolved zinc; and whole effluent toxicity (WET). During 2011, all analytical results were below the <br />CDPS permit's 30 -day average or daily maximum limitations and WET testing results were within permit <br />limits. The 2011 DMRs are on file with the CDPHE -Water Quality Control Division. Water quality <br />monitoring will continue in 2012 <br />4.7 Radioactive Materials License <br />The RTP building, foundation and sediments excavated from the upper portion of Indian Creek below the <br />old RTP area were placed in the Tie Camp Disposal Cell in 2001. Final grading and revegetation of the <br />RTP area was started in 2002 and completed in 2003. With the removal of the RTP, the radioactive <br />source material and any treatment capacity have been removed. Small concentrations of the Radium <br />226 isotope remain in the sediment deposited upstream of the sediment control embankment. The <br />Radioactive Materials License (RML) for the Pitch Reclamation Project was renewed in April 2008. <br />License renewal #14 allows Homestake to manage the Tie Camp Low -Grade Stockpile and the sediment <br />upstream of the sediment control embankment within the guidelines of the license. A copy of the 2011 <br />Annual RML letter report is provided in electronic Adobe Acrobat Portable Document Format on the CD <br />attached to this report. <br />Pitch 2011 Reclamation Finalreport 19Apr12.Doc <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.