My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-25_HYDROLOGY - C1980001 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980001
>
2012-04-25_HYDROLOGY - C1980001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:49 PM
Creation date
4/25/2012 2:20:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
HYDROLOGY
Doc Date
4/25/2012
Doc Name
1st Quarter 2012 Impoundment Inspection Report
From
Chevron Mining Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A, WWC ENGINEERING <br />April 24, 2012 <br />Permit CO -80 -001 <br />Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203 -2273 <br />RE: Edna Mine; First Quarter 2012 Impoundment Inspection Report <br />Dear Janet: <br />611 Skyline Road - Laramie, Wy 82070 - (307) 742 -0031 <br />FAX (307) 721 -2913 - E -mail: infolar @wwcengineering.com <br />RECEIVED <br />APR 2 5 ?fie <br />Divisw v.. , uu a2�YlOt1, <br />Mining and Safety <br />This letter constitutes the First Quarter 2012 Impoundment Inspection Report for the Edna Mine; <br />Permit No. CO -80 -001. This report covers the time period from January 1, 2012 to March 31, <br />2012. The inspections were performed on February 28, 2012 by Field Inspector Chris Miller. <br />On the date of inspection all structures were functioning as designed. <br />The Impoundment Location Map details the location of each impoundment inspected <br />(Attachment A). Quarterly Pond Inspection Reports document water level, sediment level, <br />outflow, and required maintenance cited per inspection (Attachment B). As described on the <br />2012 Maintenance List two items are under review, there is currently no required maintenance at <br />the Edna Mine (Attachment C). <br />Should you have any questions regarding this material, please contact me at your convenience. <br />Sincerely, <br />Troy Su <br />Project Manager <br />TNS <br />Attachments (A, B & C) <br />File: 2011 -180 <br />cc: CMI (Tarazoff) <br />Permit (Weinman) <br />
The URL can be used to link to this page
Your browser does not support the video tag.