Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 5 of 9 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 272.30 LCY/hr <br />Adjusted fleet production: 272.3 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.952/LCY <br />Total job time <br />Total job cost <br />8.00 Hours <br />$2,074.45 <br />CIRCES Cost Estimating Software <br />