Laserfiche WebLink
Page 68 of 116 <br />CIRCES Cost Estimating Software <br />haul <br />belt portal pump house <br />20xl4 <br />Demo. and on -site <br />280.00 <br />SF <br />$2.68 <br />$750.40 <br />slab <br />disposal in <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />belt portal pump house <br />2x1 <br />Demo. and on -site <br />68.00 <br />LF <br />$6.43 <br />$437.24 <br />footer <br />disposal in <br />excavated pit, 1.0 <br />ft. x 2 ft. - Max. <br />200 ft. push <br />Electrical substation <br />19xl4x10 <br />Bldg. (SN) <br />2,660.00 <br />CF <br />$0.18 <br />$486.78 <br />demo. /on -site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />electircal substation <br />19x14 <br />Demo. and on -site <br />266.00 <br />SF <br />$1.61 <br />$428.26 <br />slab <br />disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Electrical substation <br />35x35 <br />Demo. and on -site <br />1,225.00 <br />SF <br />$1.61 <br />$1,972.25 <br />slabs <br />disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Main dumpster pad <br />20x8 <br />Demo. and on -site <br />160.00 <br />SF <br />$1.61 <br />$257.60 <br />disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Slope conveyor (box <br />8x8 <br />Conveyor, <br />240.00 <br />LF <br />$42.26 <br />$10,142.40 <br />truss section) <br />elevated, <br />including supports <br />-5ft. Wx 6ft. <br />H housing <br />Slope conveyor (non- <br />4x4 <br />Convevor, <br />110.00 <br />LF <br />$42.26 <br />$4,648.60 <br />box truss section) <br />elevated, <br />including supports <br />- 5ft.Wx 6ft. <br />H housing <br />Magnet Dumpster Pad <br />8x8 <br />Demo. and on-site <br />64.00 <br />SF <br />$1.61 <br />$103.04 <br />#1 <br />disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Coal Stack Tube #1 <br />14.5xl2x25 <br />Bldg. (MN) <br />4,350.00 <br />CF <br />$0.21 <br />$917.85 <br />Head House <br />demo. /on -site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />Magnet Dumpster Pad <br />8x8 <br />Demo. and on-site <br />64.00 <br />SF <br />$1.61 <br />$103.04 <br />#2 <br />disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft. push <br />Raw Coal Conveyor <br />4x4 <br />Conveyor, <br />177.00 <br />LF <br />$42.26 <br />$7,480.02 <br />CIRCES Cost Estimating Software <br />