My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-25_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2012-04-25_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:50 PM
Creation date
4/25/2012 10:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/25/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 63 of 116 <br />Task description: <br />Site: King Coal Mine <br />Permit Action: Permit Renewal 6 Permit /Job #: C1981035 <br />SAFEGUARDING UNDERGROUND OPENINGS <br />Seal Mine Openings <br />PROJECT IDENTIFICATION <br />Task #: 100 <br />Date: 4/23/2012 <br />User: SLB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Opening Description <br />Dimensions <br />Closure Method <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Portal 1 seal <br />200 <br />Adit closure - bulkhead <br />200.00 <br />SF <br />$97.24 <br />$19,448.00 <br />seal, > =36 sq. ft. (per sq. <br />ft.) <br />Portal 1 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$6.50 <br />$1,072.50 <br />diameter (per In. ft. incl. <br />mat. & labor) <br />Portal 1 backfill <br />185 <br />Adit closure - backtillins <br />185.00 <br />CY <br />$2.11 <br />5390.35 <br />(per cu. yd.) <br />Portal 2 seal <br />200 <br />Adit closure - bulkhead <br />200.00 <br />SF <br />$97.24 <br />$19,448.00 <br />seal, >= 36 sq. ft. (per sq. <br />ft.) <br />Portal 2 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$6.50 <br />$1,072.50 <br />diameter (per In. ft. incl. <br />mat. & labor) <br />Portal 2 backfill <br />185 <br />Adit closure - backfilling <br />185.00 <br />CY <br />$2.11 <br />$390.35 <br />(per cu. d.) <br />Portal 3 seal <br />200 <br />Adit closure - bulkhead <br />200.00 <br />SF <br />$97.24 <br />$19,448.00 <br />seal, >= 36 sq. ft. (per sq. <br />ft.) <br />Portal 3 drain pipe <br />165 <br />PVC drainpipe,, 6 in. <br />165.00 <br />LF <br />$6.50 <br />$1,072.50 <br />diameter (per In. ft. incl. <br />mat. & labor) <br />Portal 3 backfill <br />185 <br />Adit closure - backfilling <br />185.00 <br />CY <br />$2.11 <br />$390.35 <br />(per cu. yd.) <br />Portal 4 seal <br />200 <br />Adit closure - bulkhead <br />200.00 <br />SF <br />$97.24 <br />$19.448.00 <br />seal, >= 36 sq. ft. (per sq. <br />ft.) <br />Portal 4 drain pipe <br />165 <br />PVC drainpipe, 6 in. <br />165.00 <br />LF <br />$6.50 <br />$1,072.50 <br />diameter (per In. ft. Incl. <br />mat. & labor) <br />Portal 4 backfill <br />185 <br />Adit closure - backfilling <br />185.00 <br />CY <br />$2.11 <br />$390.35 <br />(per cu. yd.) <br />Job Hours: CTJT <br />State: Colorado <br />County: La Plata <br />Abbreviation: None <br />Filename: CO35 -100 <br />Total Cost: S83,643.40 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.