Laserfiche WebLink
Page 61 of 116 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Volume: <br />Loading Tool Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />18.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 15.21 <br />Bucket Size Class: NA <br />3.900 LCY (heaped) <br />0.975 Loose material - mixed moist aggregates (95- 100 %) 0.975 <br />3.803 LCY <br />Site Altitude (ft.): 7500 feet <br />Net Correction: 1 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cy_ cle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 1 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cy_ cle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />1 -0.040 <br />1 (Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />1 0.000 <br />1 (Cat HB) <br />Truck Cycle Time: <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.080 <br />0.403 <br />1.308 <br />minutes <br />minutes <br />minutes <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minul <br />Truck Load Time: 1.308 Minutes Adjusted for site altitude: 1.308 Minus <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minul <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />194VA <br />4 passes <br />0.483 minutes <br />CIRCES Cost Estimating Software <br />