Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: King I - Rip 12" in upper facility area <br />Site: King Coal Mine Permit Action: Permit Renewal 6 Permit /Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 4/20/2012 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Rippe: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Alternate Methods: <br /> )eismic: NA Bank Volume: NA BCY NA <br />Area: 1.96 acres Rip Depth (ft): 1.00 Volume: 3,162 BCY or CCY <br />Source of estimated quantity: Map King I -007 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet /second <br />Area <br />Average Ripping Depth: <br />1.00 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$65.28 <br />Average Ripping Length: <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />88.00 <br />100 <br />Ripper Operating Cost/Hour: <br />$6.49 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />Job Condition Correction Factors <br />NA <br />Total Unit Cost/Hour: <br />$213.07 <br />0.800 <br />Total Fleet Cost/Hour: <br />$213.07 <br />7,400 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br /> )eismic: NA Bank Volume: NA BCY NA <br />Area: 1.96 acres Rip Depth (ft): 1.00 Volume: 3,162 BCY or CCY <br />Source of estimated quantity: Map King I -007 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet /second <br />Area <br />Average Ripping Depth: <br />1.00 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.800 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.800 <br />Acres/hr <br />Site Altitude: <br />7,400 <br />feet <br />Altitude Adj : <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.66 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.66 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $321.070 Per acre <br />DBMS <br />Abbreviation: None <br />Filename: 0035 -002 <br />Total job time: <br />Total job cost: <br />2.9 Hours <br />$629.00 <br />