Laserfiche WebLink
Page 55 of 116 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region <br />Total one -way travel distance <br />Average Travel Speed <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals:: <br />JOB TIME AND COST <br />Total job time: <br />Total job cost: <br />8.00 Hours <br />.774.21 <br />SITE MAINTENANCE <br />Task description: King II -Rill and gully maint. 8 hours every other yr, 10 yrs <br />Site: King Coal Mine Pen Action: Permit Renewal 6 Permit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 060 State: Colorado <br />Date: 4/23/2012 County: La Plata <br />User: SLB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Maintenance <br />Hours per <br />Menu Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Item <br />year <br />NA <br />4.00 <br />1.00 <br />Cost <br />D3 Dozer <br />8.00 <br />Cat D3K LGP - 3P <br />24.00 <br />EA <br />$79.43 <br />$1,906.32 <br />12M Grader <br />8.00 <br />CAT 12M <br />24.00 <br />EA <br />$94.77 <br />$2,274.48 <br />Job Hours: 0.00 <br />DURANGO <br />20.00 miles <br />40.00 inph <br />$2,569.71 <br />$204.50 <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />2.00 <br />NA <br />1.00 <br />NA <br />4.00 <br />1.00 <br />Abbreviation: None <br />Filename: CO35 -060 <br />Total Cost: $4,180.80 <br />CIRCES Cost Estimating Software <br />