Laserfiche WebLink
Page 51 of 116 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one -way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />`* <br />$9,812.10 <br />two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$262.52 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />2.00 <br />NA <br />1.00 <br />NA <br />4.00 <br />1.00 <br />Total job time <br />8.00 Hours <br />Total job cost: $10,074.62 <br />CIRCES Cost Estimating Software <br />