Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: <br />Site: King Coal Mine <br />I - Haul topsoil to post -law refuse area <br />Pen Action: Permit Renewal 6 <br />Pennit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 017 State: Colorado <br />Date: 4/22/2012 County: La Plata <br />User: SLB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 938H <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />Cnst Breakdown! Tnick/Loader Team Srnnnort Frniinment Maintenance Rnrninment <br />Total work team cost/hour: $247.66 <br />MATERIAL QUANTITIES <br />Initial volume: 871 CCY Swell factor: 1.429 <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,850 Pounds/LCY <br />User Provided <br />35,400 Pounds <br />12.42 LCY <br />Abbreviation: None <br />Filename: CO35 -017 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$12.32 <br />$22.07 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$62.56 <br />$37.34 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$74.88 <br />$97.90 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $247.66 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $247.66 <br />MATERIAL QUANTITIES <br />Initial volume: 871 CCY Swell factor: 1.429 <br />Loose volume: 1,245 LCY <br />Source of estimated volume: 1.08 acres, 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,850 Pounds/LCY <br />User Provided <br />35,400 Pounds <br />12.42 LCY <br />Abbreviation: None <br />Filename: CO35 -017 <br />