Laserfiche WebLink
Description <br />Cost /Acre <br />Drill seeding {DMG} <br />$90.11 <br />Total Seed Application Cost /Acre <br />$90.11 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 3125 14.16 1200} <br />2.00 <br />TON <br />$164.00 <br />$328.00 <br />Total Mulch Materials Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />I $0.00 <br />$328.00 <br />Application <br />Description <br />Cost /Acre <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$79.71 <br />Total Mulch Application Cost /Acre <br />$79.71 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Tv a and Size <br />p <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />I $0.00 <br />JOB TIME AND COST <br />No. of Acres: 1.19 Cost /Acre: $643.85 <br />Estimated Failure Rate: 50% Cost /Acre *: $138.05 <br />*Selected Replanting Work Items <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />SEEDING <br />$766.18 <br />$82.14 <br />$848.32 <br />4.00 <br />