Laserfiche WebLink
Truck Load Time: 0.885 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />Haul Route: <br />Minutes Adjusted for site altitude: 0.885 <br />Minutes Adjusted for site altitude: 0.900 <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />1100.00 <br />-6.00 <br />5.00 <br />-1.00 <br />2938 <br />0.444 <br />Haul Time: 0.444 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />1100.00 <br />6.00 <br />5.00 <br />11.00 <br />1584 <br />0.702 <br />Loading Tool unit <br />Production 494.19 <br />Truck Unit Production <br />199.49 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.702 <br />Total Truck Cycle Time: 3.431 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 331.15 <br />Adjusted single truck/loader team production: 331.15 <br />Adjusted multiple truck/loader team production: 331.15 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.748 /LCY <br />minutes <br />minutes <br />Minutes <br />Minutes <br />410.18 LCY/Hour <br />165.58 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />L C Y/Hour <br />LCY/Hour <br />Total job time: 3.19 Hours <br />Total job cost: $790.50 <br />