Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: King I - Haul topsoillgrowth medium to highwall <br />Site: King Coal Mine Permit Action: Permit Renewal 6 Permit /Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 007 <br />Date: 4/20/2012 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Abbreviation: None <br />Filename: 0035007 <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 938H <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdoi n: Truck/Loader Team Sunnort EQUlnment Maintenance Eauinment <br />Total work team cost/hour: $247.66 <br />MATERIAL OUANTITIES <br />Initial volume: 1,057 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.32 <br />$22.07 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$62.56 <br />$37.34 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$74.88 <br />$97.90 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $247.66 <br />Support: $0.00 <br />Maim: $0.00 <br />Total work team cost/hour: $247.66 <br />MATERIAL OUANTITIES <br />Initial volume: 1,057 <br />CCY <br />Loose volume: 1,057 <br />LCY <br />Source of estimated volume: <br />1.96 acres, 6" <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />Swell factor: 1.000 <br />